Mbora Water Project

service-single
service-single-2

Bringing Safe, Reliable Water Closer to the Community

The Mbora Water Project is a community water development initiative in South West Nyakach, Nyakach Sub-County, Kisumu County, established to improve access to safe and reliable water for the local community.

 

The project was designed to address the challenge of limited access to potable water, where community members had been relying on unprotected water sources. The planned solution combines groundwater development with renewable energy and elevated water storage.

service_video

Project Impact

The Mbora Water Project represents more than the construction of water infrastructure. It is an investment in:

  • Access to clean and safe water
  • Improved community health and hygiene
  • Reduced dependence on unprotected water sources
  • Sustainable solar-powered water supply
  • Improved livelihoods and community wellbeing
  • Reliable water storage and distribution

A Sustainable Water Supply Solution

The project comprises a borehole equipped with a solar-powered water pumping system, an elevated water storage tank and a communal water point. This integrated approach provides a practical way of abstracting groundwater, storing it and making it accessible to the community.

 

The project was estimated at KSh 4 million and was expected to benefit approximately 350 households upon completion.

AQUAVIEW’s Role

AQUAVIEW Engineering Kenya Ltd was responsible for the supply, installation, testing, commissioning, and technical support of the hybrid solar-powered water pumping system for the Mbora Water Project in Nyakach Sub-County, Kisumu County.

The scope included:

  • Borehole equipping for a design discharge of 7 m³/hour and a total dynamic head of 80 metres.
  • Supply and installation of a Dayliff DS8-25 4kW pump end with a DSM 4kW three-phase submersible motor.
  • Supply and installation of 18 × 200W monocrystalline solar panels.
  • Installation of a Dayliff SVB2 3.7kW Sunverter solar inverter and disconnect switch.
  • Installation of submersible and underground cables, riser pipes and mounting structures.
  • Installation of a water meter and float switch for flow monitoring and water-level control.
  • Complete system installation, testing and commissioning, including mobilisation and technical support.
  • Provision of a one-year quarterly inspection and maintenance package to support reliable operation, optimal performance and long-term sustainability.

In short: AQUAVIEW served as the technical implementation partner responsible for delivering and commissioning the project’s hybrid solar-powered water pumping solution, from equipment supply through installation, testing, commissioning and post-installation technical support.

Project Information

Category

:  Water Infrastructure

Client

:  Living Water International

Year

:  2023

Objective

:  Improve access to safe, reliable water

Location

:  Nyakach Sub-county

Water Source

:  Borehole

Power Source

:  Solar energy

Storage

:  Elevated water tank

Target Beneficiaries

:  350 households

Rating

:

Ensure Your Water Security.

CALLUSNOW
Contact us
Ensure the long-term yield and sustainability of your water project. Reach out to our technical team to schedule an on-site assesment or survey.

Talk to an Engineer

Hoteline: (+254) 725 228783

Kiriti Catholic Community water

service-single
service-single-2

Installation of Hybrid Solar-Electric Pumping System

Aquaview successfully completed the supply, delivery, installation, and commissioning of a high-efficiency hybrid solar-electric water pumping system for Kiriti Catholic Church. Supported by Living Water International and Caritas, this project delivers a reliable, sustainable water source for both church facilities and the surrounding community by integrating renewable solar energy with grid utility backup.

service_video

Key Technical Specifications

Borehole & Hydrological Profile

  • Borehole Depth: 190m
  • Static Water Level (SWL): 33.98 m
  • Pumping Water Level (PWL): 129.80 m
  • Pump Installation Depth (PID): 168 m
  • Discharge Flow Rate: 8 m^3/hr
Key Technical Specifications
  • Energy Cost Reduction: Maximizes solar energy during daylight hours, drastically cutting operational electricity costs.

  • Uninterrupted Supply: Seamlessly switches to grid power during prolonged overcast conditions or peak evening demand.

  • Community Resilience: Delivers a secure daily yield of clean water to enhance health, sanitation, and institutional operations.

System Components & Equipment

  • Pumping Unit: PEDROLLO 4SR6/32-S Pump End paired with a 4PD/5.5 $4text{ kW}$ Submersible Motor (Hybrid Solar/AC configuration).

  • Riser Pipeline: $2”$ heavy-duty 21-bar riser pipes ($3text{-meter}$ standard lengths).

  • Solar Infrastructure: Ground-mounted, heavy-gauge steel PV array support structure optimized for daily peak sun exposure.

  • Storage & Elevation: $6text{-meter}$ fabricated steel tower supporting a $10,000text{-liter}$ plastic storage tank positioned near the wellhead.

  • Electrical & Controls: Dual-input hybrid control panel, dry-run protection, surge arresters, liquid level sensors, and all required safety fittings.

Project Information

Category

:  Water Pumping System

Client

:  Living Water International/ Caritas

Year

:  2024

Objective

:  Improve access to safe, reliable water

Location

:  Marmanet Ward, Nyahururu

Water Source

:  Borehole

Power Source

:  Solar energy

Storage

:  Elevated water tank

Beneficiaries

:  550 households

Rating

:

Ensure Your Water Security.

CALLUSNOW
Contact us
Ensure the long-term yield and sustainability of your water project. Reach out to our technical team to schedule an on-site assesment or survey.

Talk to an Engineer

Hoteline: (+254) 725 228783

Emenwa Water Project

service-single
service-single-2

Borehole Equipping & Solarization – Emenwa Primary School

Aquaview Engineering Kenya Ltd successfully executed the borehole equipping, solarization, and hybridization of the water supply system at Emenwa Primary School in Kisii County. Designed to deliver 1.4 m^3/hr at a total head of 100 meters, this turnkey solution provides a clean, sustainable, and reliable water source for the school and surrounding community.

service_video

Key Technical Specifications

System Performance & Profile

  • Target Discharge Flow Rate: 1.4 m^3/hr
  • Design Head: 100 m
  • Primary Power Source: Solar Photovoltaic (PV) with hybrid capability

Pumping & Solar Equipment

  • Submersible Pump: Dayliff DSP1-20 (0.75 kW) pump end and motor complete with control box.

  • Solar Inverter: Dayliff SV3 1.5 kW single-phase Sunverter.

  • PV Array: 8 * 200W Dayliff high-efficiency monocrystalline solar panels (1.6 kWp total).

  • Mounting Structure: Heavy-duty ground-mounted steel solar panel frame.

Borehole Topworks & Safety Systems

  • Wellhead Assembly: Borehole cover plate with adapter, mechanical water meter, isolation disconnect switch, and submerged drop cables.

  • System Protections: Dedicated lightning arrestor system, surge protection, and ground earthing kit.

  • Auxiliaries: Complete electrical accessories, pipe fittings, and safety protections.

Scope of Services Delivered

  • Supply & Installation: End-to-end procurement, site delivery, civil mounting work, and electrical integration.

  • Testing & Commissioning: Full system performance testing, flow verification, and operational handover.

  • Maintenance & Support: Comprehensive labor and mobilization package, including 1 year of scheduled servicing (4 quarterly maintenance visits).

Project Information

Category

:  Water Infrastructure

Client

:  Living Water International

Year

:  2023

Objective

:  Improve access to safe, reliable water

Location

:  Nyakach Sub-county

Water Source

:  Borehole

Power Source

:  Solar energy

Storage

:  Elevated water tank

Target Beneficiaries

:  350 households

Rating

:

Ensure Your Water Security.

CALLUSNOW
Contact us
Ensure the long-term yield and sustainability of your water project. Reach out to our technical team to schedule an on-site assesment or survey.

Talk to an Engineer

Hoteline: (+254) 725 228783

St.Mary’s Ukwala Borehole drilling

service-single
service-single-2

Ukwala, Ugenya Sub-County, Siaya County

Aquaview Engineering Kenya Limited was contracted to deliver a sustainable and climate-resilient water supply solution for St. Mary’s Ukwala High School in Siaya County. To resolve perennial water shortages that adversely affected learning, sanitation, and student welfare, Aquaview executed an end-to-end borehole development and solar-powered pumping installation.



Key Project Outcomes
  • Continuous Water Access: Guaranteed daily supply for drinking, food preparation, and sanitation needs.
  • Zero Fuel/Utility Bills: Powered by solar energy to eliminate monthly operational costs.
  • Improved Institutional Health: Enhanced sanitation standards and student well-being across campus.

Scope of Work

  • Hydrogeological Survey

    • Executed a hydrogeological site assessment to pinpoint the optimal drilling location for high yield and long-term groundwater sustainability.

  • Borehole Drilling

    • Successfully drilled to a depth of 110 meters using heavy-duty rotary drilling equipment suitable for the local geology.

  • Well Construction & Casing

    • Lined the borehole with high-grade, corrosion-resistant PVC casings to secure structural stability and protect water quality.

    • Installed a graded gravel pack to optimize filtration and prevent sand/silt intrusion.

  • Test Pumping & Yield Determination

    • Conducted step-drawdown and constant-rate test pumping procedures to evaluate well performance.

    • Established a sustainable yield of 5 m^3/hour}, adequately covering the daily requirements of the institution.

  • Water Quality Analysis

    • Performed full physicochemical and bacteriological laboratory testing at an accredited facility.

    • Verified complete compliance with WHO and KEBS drinking water standards.

  • Solar Pump Installation

    • Outfitted the wellhead with an off-grid solar-powered pumping system, featuring:

      • High-efficiency solar PV panel array

      • Submersible borehole pump

      • Solar inverter, control unit, and system protections

      • Risers, cables, and distribution pipework

Project Information

Category

:  Borehole Drilling

Client

:  St. Mary’s Ukwala High School

Year

:  2023

Objective

:  Improve access to safe, reliable water

Location

:  Ukwala, Ugenya Sub-County

Water Source

:  Borehole

Prject Status

:  Completed.

Storage

:  – –

Target Beneficiaries

:  School Population

Rating

:

Ensure Your Water Security.

CALLUSNOW
Contact us
Ensure the long-term yield and sustainability of your water project. Reach out to our technical team to schedule an on-site assesment or survey.

Talk to an Engineer

Hoteline: (+254) 725 228783