Aquaview Engineering Kenya Ltd successfully executed the borehole equipping, solarization, and hybridization of the water supply system at Emenwa Primary School in Kisii County. Designed to deliver 1.4 m^3/hr at a total head of 100 meters, this turnkey solution provides a clean, sustainable, and reliable water source for the school and surrounding community.
Submersible Pump: Dayliff DSP1-20 (0.75 kW) pump end and motor complete with control box.
Solar Inverter: Dayliff SV3 1.5 kW single-phase Sunverter.
PV Array: 8 * 200W Dayliff high-efficiency monocrystalline solar panels (1.6 kWp total).
Mounting Structure: Heavy-duty ground-mounted steel solar panel frame.
Wellhead Assembly: Borehole cover plate with adapter, mechanical water meter, isolation disconnect switch, and submerged drop cables.
System Protections: Dedicated lightning arrestor system, surge protection, and ground earthing kit.
Auxiliaries: Complete electrical accessories, pipe fittings, and safety protections.
Supply & Installation: End-to-end procurement, site delivery, civil mounting work, and electrical integration.
Testing & Commissioning: Full system performance testing, flow verification, and operational handover.
Maintenance & Support: Comprehensive labor and mobilization package, including 1 year of scheduled servicing (4 quarterly maintenance visits).
Category
: Water Infrastructure
Client
: Living Water International
Year
: 2023
Objective
: Improve access to safe, reliable water
Location
: Nyakach Sub-county
Water Source
: Borehole
Power Source
: Solar energy
Storage
: Elevated water tank
Target Beneficiaries
: 350 households
Rating
:
![]()
Hoteline: (+254) 725 228783