The Mbora Water Project is a community water development initiative in South West Nyakach, Nyakach Sub-County, Kisumu County, established to improve access to safe and reliable water for the local community.
The project was designed to address the challenge of limited access to potable water, where community members had been relying on unprotected water sources. The planned solution combines groundwater development with renewable energy and elevated water storage.
The Mbora Water Project represents more than the construction of water infrastructure. It is an investment in:
The project comprises a borehole equipped with a solar-powered water pumping system, an elevated water storage tank and a communal water point. This integrated approach provides a practical way of abstracting groundwater, storing it and making it accessible to the community.
The project was estimated at KSh 4 million and was expected to benefit approximately 350 households upon completion.
AQUAVIEW Engineering Kenya Ltd was responsible for the supply, installation, testing, commissioning, and technical support of the hybrid solar-powered water pumping system for the Mbora Water Project in Nyakach Sub-County, Kisumu County.
The scope included:
In short: AQUAVIEW served as the technical implementation partner responsible for delivering and commissioning the project's hybrid solar-powered water pumping solution, from equipment supply through installation, testing, commissioning and post-installation technical support.
Category
: Water Infrastructure
Client
: Living Water International
Year
: 2023
Objective
: Improve access to safe, reliable water
Location
: Nyakach Sub-county
Water Source
: Borehole
Power Source
: Solar energy
Storage
: Elevated water tank
Target Beneficiaries
: 350 households